• AMEY Waste Management Facility. Waterbeach. Cambridge.


    External cladding to the main reception area where all staff and guests arrive.

     

    The elevation is south facing so has weathered particularly badly with the sun shining on it and the contaminants in the air oxidising the surface of the cladding.

     

    This did not give the facility the clean and welcoming look they hope to portray so needed a solution.

     

    The pictures show the before and after results of our work.

     

    We use IPAF licensed operators for the access equipment to be able to reach from ground to the top of the elevation.
    Then the area was degreased and redecorated with 2 coats of a specialist water based grab primer / top coat system that
    is formulated to adhere to many surfaces, included pre-finished cladding. Upon completion the management team were very impressed and complimentary as the project was started and completed in the same week and the frontage of the building looked good as new with an 8 year warrantee on the finish durability.

    Before

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     



    After






     

     

     

     

     

Case Studies

The case studies shown below are additions to our ever growing commercial, industrial painting and decorating portfolio spanning

the greater area of Peterborough and East Anglia.

Chris Groome Decorating Ltd
Newbridge House

Bridgehill Road
Peterborough
Cambridgeshire
PE6 7SA

t: 01733 810018

f: 01733 810227

Contact Us

T&C     Privacy Policy     Use of Cookies     Site Map

Registered Office, Newbridge House, Bridge Hill Road, Peterborough, Cambridgeshire. PE6 7SA

Registration No  8625305 - VAT No 463059055

Submitting Form...

The server encountered an error.

Form received.

  • AMEY Waste Management Facility. Waterbeach. Cambridge.


    External cladding to the main reception area where all staff and guests arrive.

     

    The elevation is south facing so has weathered particularly badly with the sun shining on it and the contaminants in the air oxidising the surface of the cladding.

     

    This did not give the facility the clean and welcoming look they hope to portray so needed a solution.

     

    The pictures show the before and after results of our work.

     

    We use IPAF licensed operators for the access equipment to be able to reach from ground to the top of the elevation.
    Then the area was degreased and redecorated with 2 coats of a specialist water based grab primer / top coat system that
    is formulated to adhere to many surfaces, included prefinished cladding. Upon completion the management team were very impressed and complimentary as the project was started and complete in the same week and the frontage of the building looked good as new with an 8 year warrantee on the finish durability.

    Before

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    After






     

     

     

     

     

  • AMEY Waste Management Facility. Waterbeach. Cambridge.


    External cladding to the main reception area where all staff and guests arrive.

     

    The elevation is south facing so has weathered particularly badly with the sun shining on it and the contaminants in the air oxidising the surface of the cladding.

     

    This did not give the facility the clean and welcoming look they hope to portray so needed a solution.

     

    The pictures show the before and after results of our work.

     

    We use IPAF licensed operators for the access equipment to be able to reach from ground to the top of the elevation.
    Then the area was degreased and redecorated with 2 coats of a specialist water based grab primer / top coat system that
    is formulated to adhere to many surfaces, included prefinished cladding. Upon completion the management team were very impressed and complimentary as the project was started and complete in the same week and the frontage of the building looked good as new with an 8 year warrantee on the finish durability.

    Before

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    After

  • AMEY Waste Management Facility. Waterbeach. Cambridge.


    External cladding to the main reception area where all staff and guests arrive.

     

    The elevation is south facing so has weathered particularly badly with the sun shining on it and the contaminants in the air oxidising the surface of the cladding.

     

    This did not give the facility the clean and welcoming look they hope to portray so needed a solution.

     

    The pictures show the before and after results of our work.

     

    We use IPAF licensed operators for the access equipment to be able to reach from ground to the top of the elevation.
    Then the area was degreased and redecorated with 2 coats of a specialist water based grab primer / top coat system that
    is formulated to adhere to many surfaces, included prefinished cladding. Upon completion the management team were very impressed and complimentary as the project was started and complete in the same week and the frontage of the building looked good as new with an 8 year warrantee on the finish durability.

    Before

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    After






     

     

     

     

     

  • AMEY Waste Management Facility. Waterbeach. Cambridge.


    External cladding to the main reception area where all staff and guests arrive.

     

    The elevation is south facing so has weathered particularly badly with the sun shining on it and the contaminants in the air oxidising the surface of the cladding.

     

    This did not give the facility the clean and welcoming look they hope to portray so needed a solution.

     

    The pictures show the before and after results of our work.

     

    We use IPAF licensed operators for the access equipment to be able to reach from ground to the top of the elevation.
    Then the area was degreased and redecorated with 2 coats of a specialist water based grab primer / top coat system that
    is formulated to adhere to many surfaces, included prefinished cladding. Upon completion the management team were very impressed and complimentary as the project was started and complete in the same week and the frontage of the building looked good as new with an 8 year warrantee on the finish durability.

    Before

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    After






     

     

     

     

     

  • AMEY Waste Management Facility.

    Waterbeach. Cambridge.


    External cladding to the main reception area where all staff and guests arrive.

     

    The elevation is south facing so has weathered particularly badly with the sun shining on it and the contaminants in the air oxidising the surface of the cladding.

     

    This did not give the facility the clean and welcoming look they hope to portray so needed a solution.

     

    The pictures show the before and after results of our work.

     

    We use IPAF licensed operators for the access equipment to be able to reach from ground to the top of the elevation.
    Then the area was degreased and redecorated with 2 coats of a specialist water based grab primer / top coat system that
    is formulated to adhere to many surfaces, included prefinished cladding. Upon completion the management team were very impressed and complimentary as the project was started and complete in the same week and the frontage of the building looked good as new with an 8 year warrantee on the finish durability.

    Before

     

     

     

     

     

     

     

     

     

     

     

    After

  • AMEY Waste Management Facility.

    Waterbeach. Cambridge.


    External cladding to the main reception area where all staff and guests arrive.

     

    The elevation is south facing so has weathered particularly badly with the sun shining on it and the contaminants in the air oxidising the surface of the cladding.

     

    This did not give the facility the clean and welcoming look they hope to portray so needed a solution.

     

    The pictures show the before and after results of our work.

     

    We use IPAF licensed operators for the access equipment to be able to reach from ground to the top of the elevation.
    Then the area was degreased and redecorated with 2 coats of a specialist water based grab primer / top coat system that
    is formulated to adhere to many surfaces, included prefinished cladding. Upon completion the management team were very impressed and complimentary as the project was started and complete in the same week and the frontage of the building looked good as new with an 8 year warrantee on the finish durability.

    Before

     

     

     

     

     

     

     

     

     

     

    After